Images taken during site visits to Exide Technologies in March and April 2014.

 
Exide_003
April 18, 2014 -- View inside the Reverb Furnace Feedstock Room
 
Exide_002
April 18, 2014 -- Leaking gasket at reaction tank - acidic waste has removed the protective coating.
 
Exide_004
March 21, 2014 -- Poor condition of the foundation support for the Santa Maria Tank -2
 
Exide_005
March 21, 2014-- Reaction Tank 1 utilizing an air lance for circulation of waste rather than typical rotating mixing blade.
 
Exide_001
April 18, 2014 --  Accumulation of waste on the support structure of the Hammer Mill